Update (12/31/05)
On Dec. 15, the Board of Trustees voted to eliminate the Naperville Regional Center Expansion project. In lieu of the expansion of the Naperville Regional Center at 75th Street, C.O.D. is currently developing plans for new, shared facilities with Neuqua Valley High School in Indian Prairie School District 204.

Update (11/30/05)
Program requirements and budget review is continuing.

Update (10/31/05)
Review of program requirements and space needs is continuing, along with the project budget, which is still in progress. Upon completion, schematic design work will continue.

Update (9/30/05)
Currently, programming requirements and space needs are being reviewed, along with the project budget. When program and budget reviews are completed, schematic design work will continue.

Update (8/31/05)
Schematic design drawings are currently being developed by OWP/P.

Update (5/31/05)

Program verification is currently on going.

Update (4/30/05)
The project is currently at approximately 50 percent through the programming phase. The architect has met with each user group to identify all of the needs for the expanded space. Programming is still ongoing, with tours of local mecomtronics labs scheduled to occur.

Update (3/31/05)
On March 17, the Board of Trustees awarded the contract for A/E services to OWP/P Architects for the design of the Naperville Regional Center Expansion. The verification of the programs included within this project will be the first item to be addressed in the design phase.

Update (2/28/05)

A/E qualification submissions were due on Feb. 17. A/E interviews will occur on March 9. An A/E recommendation will be presented to the Board of Trustees for approval at the March Board meeting. Design of the Naperville Regional Center Expansion is planned to begin in late March.


Update (12/15/04)

The building committee, along with Facilities Planning and Construction, is currently developing a detailed program statement for this project. Once the building program is finalized and approved, an architect will be selected to design the building.



 
 
footer

 

Financial Aid Classes Registration Records Library Counseling/Advising COD Online Catalog Admissions Activites Academics 90.9FM WDCB, Public Radio Resources Contact Us Search Legal Site Index Visitors Guide Maps and Directions McAninch Arts Center Employment Calendar Business and Professional Institute