Roadway, Parking Lot and Associated Landscape Improvements

Update
Phase 1 December 2007 (76 Kb PDF)
Phase 2 December 2007 (105 Kb PDF)

Phase 1 November 2007 (73 Kb PDF)
Phase 2 November 2007 (107 Kb PDF)

Phase 1 October 2007 (63 Kb PDF)
Phase 2 October 2007 (107 Kb PDF)

Phase 1 September 2007 (54 Kb PDF)
Phase 2 September 2007 (72 Kb PDF)

Phase 1 August 2007 (60 Kb PDF)
Phase 2 August 2007 (84 Kb PDF)

Phase 1 July 2007 (61 Kb PDF)
Phase 2 July 2007 (88 Kb PDF)

Phase 1 June 2007 (60 Kb PDF)
Phase 2 June 2007 (83 Kb PDF)

Phase 1 May 2007 (74 Kb PDF)
Phase 2 May 2007 (88 Kb PDF)

Phase 1 April 2007 (74 Kb PDF)
Phase 2 April 2007 (88 Kb PDF)

Phase 1 March 2007 (74 Kb PDF)
Phase 2 March 2007 (83 Kb PDF)

Phase 1 February 2007 (61 Kb PDF)
Phase 2 February 2007 (79 Kb PDF)

Phase 1 January 2007 (61 Kb PDF)
Phase 2 January 2007 (79 Kb PDF)
Phase 1 December 2006 (62 Kb PDF)
Phase 2 December 2006 (79 Kb PDF)

Phase 1 November 2006 (62 Kb PDF)
Phase 2 November 2006 (79 Kb PDF)

Phase 1 October 2006 (62 Kb PDF)

Phase 1 October 2006 (78 Kb PDF)

Phase 1 September 2006 (65 Kb PDF)

Phase 2 September 2006 (79 Kb PDF)

Phase 1 August 2006 (62 Kb PDF)
Phase 2 August 2006 (78 Kb PDF)

Phase 1 July 2006 (62 KB PDF)
Phase 2 July 2006 (81 Kb PDF)

Phase 1 June 2006 (62 Kb PDF)
Phase 2 June 2006 (78 Kb PDF)

Phase 1 May 2006 (62 Kb PDF
)
Phase 2 May 2006 (63 Kb PDF)

Phase 1 April 2006 (28 Kb PDF)
Phase 2 April 2006 (28 Kb PDF)

Phase 1 March 2006 (52 Kb PDF)
Phase 2 March 2006 (48 Kb PDF)

Phase 1 February 2006 (68 Kb PDF)
Phase 2 February 2006 (48 Kb PDF)



Update (12/31/05)
Final paving of Lots P and O and Center Drive was delayed due to extremely cold temperatures at the end of November and beginning of December.

Update (11/30/05)
Final pavement of Lot P and Center Drive is to be completed by the end of November. Pavement marking is scheduled to be completed the first week of December. Lot P and Center Drive are to open for public use in December. Lot O is scheduled to be paved in December.

Update (10/31/05)
Curbs and sub-base are to be completed in Lot P and Circle Drive by the end of the October. Pavement for both Lot P and Circle Drive is to start by the end of October. It is anticipated that Lot O will be open for public parking in the spring 2006.

Update (9/30/05)
This project started at the beginning of September with construction of the north/south roadway and installation of the new electrical duct bank. Construction of the new Parking Lot P is expected to be completed by the end of October. Construction of Parking Lot O is pending permit approval by the Village of Glen Ellyn.

Update (8/31/05)
On July 14, the Board of Trustees awarded the contract for construction to Abbey Paving Co., Inc. Construction is scheduled to begin at the beginning of September. The work to be completed in 2005 includes two new parking lots P and O, a new roadway from College Road to Circle Drive, and installation of a fiber optic duct bank for future communication systems.

Update (5/31/05)
Schematic design was presented and approved by the Board of Trustees on May 12, 2005. The project is currently in the design development phase. Bid documents are anticipated to be complete in August 2005.

Update (4/30/05)
The proposed schematic design will be presented to the Board of Trustees on May 12. The topographical site and utility surveys have been completed. Geotechnical exploration (soil borings) for the existing parking and roadway areas on east campus has also been completed.
Update (3/31/05)
The project is in the schematic design phase. The topographical site survey has been completed. The utility survey is 90 percent complete. Geotechnical explorations (soil borings) for the existing parking and roadway areas on the east campus are being conducted.

Update (2/28/05)

The project is in the schematic design phase. Design meetings are ongoing. The topographical site survey of C.O.D.’s campus is ongoing.

 